Map › Regulatory journey
Testing, approval, deployment and in-use oversight, and where the law changes hands. Position as of 2026-08-27.
Nine stages take an automated driving system from safety engineering to incident response. The function column marks whether a stage answers a type-approval question or an operational one. The break between stage 5 and stage 6 is the Second Gate: technical approval ends there and a separate legal permission to operate begins.
1
2
3
4
5
Second Gate — technical approval ends, legal permission to operate begins
6
7
8
9
Provenance
ROAT Regulatory Map 2026 – Reconstructed Draft v0.7.1 (PraF UK), sheet "Regulatory Journey v0.3", cut-off 2026-08-27. Conceptual bridge between type approval and road or service operation. Module 02 codes what actually stands at the operational gate in eight regimes.